Professional concrete cutting for basement bathroom installations in Massachusetts. Slab cutting for toilet, shower, and sink drain lines. Free estimates from REDCORE.

4.9/5Google RatingLicensed & InsuredSame-Day ServiceFree Estimates

Adding a bathroom to a basement requires cutting through the concrete floor slab to install drain lines for the toilet, shower or tub, and sink. REDCORE specializes in the concrete cutting phase of basement bathroom installations, providing the precise trench cuts and core-drilled penetrations that plumbers need to rough in the drain-waste-vent piping below the slab. We work in basements throughout Massachusetts, coordinating with homeowners, contractors, and plumbers to deliver clean, accurate cuts that keep bathroom renovation projects on schedule.

A typical basement bathroom rough-in requires trench cuts from each fixture location to the main drain tie-in point, plus a core-drilled hole for the toilet flange. The trench width and depth depend on the pipe sizes and slope requirements specified by the plumber. REDCORE's operators understand these requirements and cut trenches that give the plumber adequate room to work while minimizing the amount of concrete that needs to be removed and replaced. We also core drill any penetrations through foundation walls needed for venting or drain connections.

Our basement bathroom concrete cutting service includes full slurry containment and cleanup, protecting your basement's existing finishes and keeping the work area manageable. We offer same-day and next-day scheduling because we know that bathroom renovations involve multiple coordinated trades, and delays in concrete cutting hold up everything that follows.

Services Used

Benefits

Trench cuts precisely positioned for each fixture location
Core-drilled toilet flange holes at exact positions
Foundation wall penetrations for vent piping
Slurry containment protects existing basement finishes
Coordination with your plumber on layout and scheduling
Concrete removal from trenches included
Fast turnaround keeps renovation schedule on track
Free on-site estimates for bathroom rough-in cutting

How It Works

1

Layout with Plumber

We work from the plumber's layout to mark trench locations for each fixture drain, the main drain run, and any wall penetrations for venting.

2

Slab Cutting

Diamond flat saws cut the trench lines at the specified widths and depths. Core drills create the toilet flange hole and any wall penetrations.

3

Concrete Removal & Cleanup

Trench concrete is broken out and removed. Slurry is cleaned up and the trenches are left ready for the plumber to install drain piping.